Tune the schedule and setback before replacing anything mechanical
- Why this comes first
A schedule that ramps from a low setback gives the building too much to recover in too little time. Raising the overnight floor by two degrees and starting the heating earlier usually shortens perceived warm-up by an hour without any capital cost.
- Evidence
EST modelling and Part L heating-controls guidance both treat schedule and setback tuning as the lowest-cost first step before any plant change.
- Confidence
High confidence. Multiple independent sources agree on the direction and the order.
- Exceptions
- Households with a medical reason to keep setback very low
- Next step
- See smart controls guidance